EXPLORE OUR IMPLEMENTED PROJECTS
Choosing us means relying on a partner committed to excellence and innovation
We’re here to support your journey
KNOW MORE ABOUT OUR PROJECTS
- A complete DX air conditioning system installation project was executed at Vark Restaurant in Riyadh.
- The system included cassette and concealed units, along with circular air ducts.
- This system boasts advanced technical features including high cooling and heating efficiency, precise temperature control, and even air distribution, ensuring the comfort and luxury of both visitors and staff at the restaurant. Additionally, the system is durable, ensuring continuous operation without interruption, and provides a comfortable and ideal environment inside the restaurant at all times.
- This project was executed by a specialized engineering team with extensive experience in HVAC systems, resulting in outstanding results that fully meet the client’s needs and expectations.
- A project to install pre-insulated air ducts was executed at the EMERSON factory in the SPARK Industrial Zone. The aim of this project is to improve the working environment inside the factory by providing an efficient and reliable ventilation system.
- The project involved the use of pre-insulated air ducts, known for their ability to reduce heat loss and improve air transmission efficiency. These ducts were carefully designed to meet industrial standards and required quality, in addition to providing a safe and healthy working environment for factory workers.
- In addition to installation, the air ducts were equipped with all necessary accessories such as mounting clamps, connectors, and noise dampers, to ensure leak-free performance and avoid technical issues.
- The project also included comprehensive tests to measure performance efficiency and ensure compliance with air quality standards and optimal airflow.
- This project was executed by specialized engineers and technicians with extensive experience in HVAC systems, resulting in outcomes that align with high-quality standards and meet the operational needs of the factory.
- This project aims to enhance the environment at King Faisal Specialist Hospital by installing a chilled water cooling system, in addition to introducing new air ducts to improve air distribution. The project was carefully planned to meet the hospital’s engineering and operational needs, with a particular focus on the comfort and safety of patients and staff.
- High-efficiency chillers were used in the cooling system to generate chilled water, which is pumped through a network of pipes to air handling units and conditioning units. New air ducts were installed to connect these units, ensuring even distribution of cold air throughout the building.
- Chillers were selected based on cooling requirements, airflow, and building size, with a focus on energy efficiency. Installation was carried out according to global engineering standards, utilizing the latest technologies in cooling and air distribution.
- Additionally, the project included comprehensive post-installation testing to ensure there were no leaks and that the system operated correctly.
- A team of specialized engineers was relied upon to ensure precise execution of the work, adhering to required health and engineering standards.
- Customer: Zarabi Trading company.
- Scope of work: Installation and start up of HVLS fans ( High Volume Low Speed) in the main warehouse area.
- Quantities: 9 ceiling mounted fans
8 wall mounted fans
With all required accessories and control wiring. - Project duration : 16 days.
- Customer: GROUP AMANA.
- Scope of work: installation of Phenolic PI duct, outdoor GI duct, and CHW Pipe cladding.
- Quantities:25,000 Sqm. Of Phenolic duct.
Cladding work for chiller yard pipe network 12” diameter. - Project duration: 8 months.
- Customer: Group Amana
- Scope of work: fabrication and installation of Aluminum cladding for the outdoor ductwork.
- Quantities: 2,000 Sqm.
- Duration: 50 days.
- Customer: HERMA international
- Scope of work: supply and installation of spiral and rectangular ductwork.
Supply and installation of VRV system powered by Samsung. - Quantities: 4,000 Sqm duct.
3,000 LM of copper pipes.
5 FAHUs
150 indoor units with all required communication wiring and setup.
- In these buildings we have inspected and applied more than 30,000 Square meters of fire rated wrapping on existing ductwork with all required accessories and modifications to make it fire resistant against any high temperatures and smoke happening in the future and keep the HVAC system safe and protected.
All works done under the supervision and approval of the material manufacturer PROMAT.
The main contractors of these buildings were:
1. Al Bawani.
2. Thabat and Latifia JV
3. UNEC
4. ABSAL PAUL
- In these buildings we have inspected and applied more than 30,000 Square meters of fire rated wrapping on existing ductwork with all required accessories and modifications to make it fire resistant against any high temperatures and smoke happening in the future and keep the HVAC system safe and protected.
All works done under the supervision and approval of the material manufacturer PROMAT.
The main contractors of these buildings were:
1. Al Bawani.
2. Thabat and Latifia JV
3. UNEC
4. ABSAL PAUL